From Construction Project to Functioning Operation
Despite Facility Management (FM) support, valuable information is often lost and important services not provided at the point where the construction project and operation intersect. With professional operational preparations, the know-how of the construction project is secured and the required services with regard to a functioning operation are provided.
The course for successful operation is already being set during construction. That is why construction-accompanying FM has been established. However, valuable information is still often lost and important services not provided at the point where the construction project and operation intersect, due to the change of knowledge beare
The Intersection of Construction Project and Operation
At the critical phase of the start of operations, there is often no precise object documentation available, key persons are not introduced to the company or are introduced too late, with the result that those who possessed information from the construction phase are no longer available. In many cases, this leads to a poor start in the utilization phase of property. Especially when dealing with extensive and demanding building complexes, the need for a reliable operating structure increases. With professional operational preparations, the know-how of the construction project is preserved, the required services with regard to a functioning operation are provided and the basic elements for sustainable value are created.
Already Anchoring Operational Preparations in the Construction Project
Through integration, loose points of contact between construction and operation become intersections. Specifically, this ensures that:
- The transfer of responsibility following completion of construction and the entry of the technical crews into service takes place smoothly.
- The essential information from construction is transferred to the company.
- The quality is secured through a consistent and complete guaranty management.
- The stress and turnover of operating personnel is minimised.
- The sustainable conservation of value is set on the right course.
- The taking over of a functioning operation is made possible.
The operational preparations with their typical project character ideally begin while construction is still being carried out, securing the successful transition to operation. On top of that, the modular structure also allows a project-oriented adaptation.